
| 69 Pitt Street, Kidderminster Worcestershire, DY10 2UN, England Phone & Fax: 44 (0)1562632000 |
| Globe Steam organized a tour to include the Welsh Highland Superpower weekend. The group flew from Germany to Manchester on the morning of Friday, 08 September 2006. Geoff Cooke met them there and drove to Llanberris, where both Llanberis Lakeside and Snowdon Mountain Railways were visited. We continued to Dinas on the WHR, and waited there for the inaugural run of the K1 Garratt. This train was then followed to Rhyd Ddu. Saturday and Sunday morning were spent riding and photographing the Superpower events. At lunchtime on Sunday, 10 September, we drove to Manchester for an afternoon flight home. |
| This report and photographs are Copyright to Geoff Cooke |
| The Llanberis Lakeside Railway with #1 "Elidir" on 08 September 2006 |
| Snowdon Mountain Railway 08 September 2006 |
| K1 standing at Rhyd Ddu for the first time in charge of a passenger train. Mont Snowdon can be seen in the distance. 08 September 2006 |
| K1, the first Garratt, operating a supporter's special train on 08 September 2006 |
| Plamerston normally works on the Ffestiniog Railway. She was hired to the Welsh Highland during the original construction, and returned to operate demonstration work's trains towards Bethgellert on the 'Phase 4' extension. |
| NGG16 Garratt # 138 approaching Rhyd Ddu on 09 September 2006. |
| NGG16 Garratt # 138 leaving Dinas on 10 September 2006. |
| NGG16 Garratt # 138 near Tryfan Junction on 10 September 2006. |